The work of this project includes repair of sag pipe within interceptor; installation of pipe piles and pipe support; rehabilitation of existing access structures; cured-in-place pipe (CIPP); temporary conveyance of wastewater; restoration of bituminous pavement, driveway aprons, and turf areas; traffic control; CCTV inspection of interceptor tunnel.