The Work generally consists of: 1.) storm drainage system improvement including; constructing approximately 142 feet of HDPE piping, and two junction boxes; 2.) construction of a storm water structure, and 3.) earth grading to provide slope stabilization, and all labor, materials, equipment, tools, superintendence; and all other services necessary to perform the work.