Project consists of two areas: The first area involves pavement widening; shoulder and ditch improvements; minor water relocation; concrete ditch outfall; driveway and road culverts; and asphalt overlay. Work is along 750 lf of roadway. The second area includes pavement widening; curb and gutter, storm sewer system, shoulder and ditch improvements; 303 linear feet of 16-inch waterline relocation; water services; driveway improvements; concrete ditch outfall; and asphalt overlay.