The project consists of: widening and surfacing of 0.46 mile of existing gravel
roadway, including; clearing and grubbing; grading; placing graded aggregate base; storm drain piping
and culverts; placing hot mix asphalt base and surface courses; constructing driveway tie-ins; retaining
wall construction; maintaining traffic; stabilizing disturbed areas, and all incidental work.