This project involves approximately 8,100 feet of roadway. It generally consists of a divided concrete boulevard section with a 13 feet raised median separation within 80 feet right of way and widening of the existing bridge. The project will have two storm sewer systems and one system tying into an existing storm sewer facility and an offsite detention pond. The pavement consists of 10-inch reinforced concrete over fly ash stabilized subgrade.