The construction of approximately 4,200 feet of 10 feet wide asphalt path and concrete curb ramps on the side of Street from, and on the west side of the Road from the Parkway to the Drive. Also included in the project will be minor ditch grading, RCP culvert installations and reinforced concrete headwall installation.