Project Description: The scope of this project includes the installation of sidewalk along one side of 133rd Ave, Parrish Ave and 137th Ave. Right Of Way acquisition will be needed on several lots throughout the proposed areas. Right-of-way Engineering has been started and includes the Title Search and Plat #1. Services still needed include Legal Descriptions, Individual Parcel Plats, Transfer Documents, APA's, Final Right-Of-Way Plans and the Staking of Right-Of-Way. All Right-Of-Way services as documented in the Right-Of-Way Acquisition Procedure Manual will need to be provided.