Note: this is an extended due date.
The project consists of but is not limited to:
1) Removal and cleaning of accumulated debris in the Retention Basin with an estimated volume of 50,000 cubic yards.
2) Transport and place the material for disposal at the City County Landfill, or other Landfill proposed by the CONTRACTOR and approved by the
OWNER.
3) Transport and place the material removed from the Retention Basin by City Forces and
temporarily stored at the Wastewater Treatment Plant
4) Perform miscellaneous piping demolition and modifications and construct cast-in-place access ramps
in the retention basin, as shown on the plans.