The following in SECTION B has been modified to include additional information: 

B-2 MINIMUM AND MAXIMIM QUANTITIES

The minimum order value for each Delivery/Task Order issued shall not be less than the minimum order value stated in the following table. The maximum order value for each Delivery/Task Order issued shall not exceed the maximum order value stated in the following table.

MINIMUM ORDER VALUE         MAXIMUM ORDER VALUE
$2,000.00                                    $10,000,000.00



The following in SECTION C has been added to include additional information:


C-3 ANTICIPATED DISTRIBUTION OF THE MAXIMUM LEVEL OF EFFORT BY LABOR CATEGORY


The following is the anticipated distribution by labor category of the maximum level of effort. This distribution shall be used by the offeror in preparing the cost proposals. If the offeror uses labor category terminology other than that used here, the offeror must provide a matrix clearly relating their proposed labor categories to those listed here.

*Note: The previous Section C-3 "CONTRACT PERSONNEL IDENTIFICATION is now C-4, and all other sections follow. See the Attachment "Updated Solicitation" for the full document.


 


The following in SECTION H has been modified to include additional information: 


H-1    LEVEL OF EFFORT


(a)    The Contractor agrees to provide the total level of effort specified in the next sentence in performance of the work described in this contract. The total level of effort for performance of this contract shall be 78,760 total hours of direct labor, including subcontractor direct labor for those subcontractors specifically identified in the Contractor's proposal as having hours included in the proposed level of effort. A breakdown of labor categories and hours is set forth in paragraph (k) below.


(f)    If the total level of effort specified in paragraph (a) above is not provided by the Contractor during the term of this contract, the Contracting Officer shall either (i) reduce the fixed fee of this contract as follows:


Fee Reduction = Fixed Fee X (Estimated LOE Hours - Expended LOE Hours)
Required LOE Hours


(k)    The anticipated breakdown by labor category of the total level of effort is as follows:


LABOR CATEGORY    HOURS
Program Manager     12,500
Senior Engineer     20,000
Junior Engineer     15,000
Senior Technician     12,700
Graphic Design     5,000
Senior Word Processor     2,600
Senior Administrator     2,900
Senior Subject Matter Expert     8,060



The following in SECTION L has been added to include additional information:


L-15 ANTICIPATED DISTRIBUTION OF DIRECT LABOR HOURS BY LABOR CATEGORIES


The following is the anticipated distribution by labor category of the maximum level of effort. This distribution shall be used by the offeror in preparing the cost proposal. NRL will provide direction on on-site/off-site/CPFF at the task order level as requirements are generated. If the offeror uses labor category terminology other than used in this provision, the offeror must provide a matrix clearly relating their proposed labor categories to those in this provision.

LABOR CATEGORY    BASE (YEAR 1)    OPTION 1 (YEAR 2)    OPTION 2 (YEAR 3)    OPTION 3 (YEAR 4)    OPTION 4 (YEAR 5)    TOTAL
Program Manager     2,500      2,500      2,500      2,500      2,500      12,500
Senior Engineer     4,000      4,000      4,000      4,000      4,000      20,000
Junior Engineer     3,000      3,000      3,000      3,000      3,000      15,000
Senior Technician     2,550      2,550      2,550      2,550      2,500      12,700
Graphic Design     1,000      1,000      1,000      1,000      1,000      5,000
Senior Word Processor     600      500      500      500      500      2,600
Senior Administrator     600      600      600      600      500      2,900
Senior Subject Matter Expert     1,700      1,590      1,590      1,590      1,590      8,060
TOTALS     15,950      15,740      15,740      15,740      15,590      78,760

*Note: The previous Section L-15 "ATTACHMENTS" is now L-18. See the Attachment "Updated Solicitation" for the full document.


 


The following in SECTION L has been added to include additional information:


L-16 MATERIALS ESTIMATE (FOR PROPOSAL PURPOSES ONLY)


Offerors shall use the following estimate (with applicable indirect costs added to the estimate) for required material costs. The material estimates below includes those directly associated items which are expected to be incorporated into end products or expended during performance and minor direct equipment expenses.


ESTIMATED MATERIALS    BASE (YEAR 1)    OPTION 1 (YEAR 2)    OPTION 2 (YEAR 3)    OPTION 3 (YEAR 4)    OPTION 4 (YEAR 5)    TOTAL
$6,258    $6,258    $6,258    $6,258    $6,258    $31,290
Total Estimated Materials                        $31,290


 


The following in SECTION L has been added to include additional information:


L-17 TRAVEL ESTIMATE (FOR PROPOSAL PURPOSES ONLY)


Offerors shall use the following estimate (with applicable indirect costs added to the estimate) for required travel costs. Travel destinations and durations will be identified in each task when applicable.
This estimate must be included in section B and the narrative rationale provided by the offeror.


**NOTE: The updated Solicitation with all of the above modifications/amendments is attached.



Jamie Newman, Contract Specialist, Phone 202-767-2974, Email Jamie.Newman@nrl.navy.mil - Naval Research Laboratory