The Coventry Board of Education is seeking structural analysis and testing services for the
gymnasium, auditorium, and adjacent areas that were added to Coventry High School
(CHS) in 1999-2000, and the gymnasium and stage areas at George Hersey Robertson
(GHR) School. The result of the analysis should include determining whether these areas
were built as specified in the design documents, whether the structures as built conform to
the building codes at the time of construction, and recommendations for remedial work to
bring these areas into code compliance if necessary.