THIS ACTION IS TO COMPLETE MARKET RESEARCH TO DETERMINE WHETHER THERE IS ADEQUATE INTEREST FOR A POTENTIAL REQUIREMENT. THIS IS A SOURCES SOUGHT NOTICE FOR A POTENTIAL REQUIREMENT LISTED THAT IS ATTACHED.
This is a sources sought notice only, a formal RFQ may not be issued from responses received.
This notice is only for the purpose of identifying potential sources as part of the Army Contracting Command -Rock Island's market research. No RFQ exists; therefore do not request a copy of the RFQ.
All information received in response to this notice marked quote mark Proprietary quote mark will be protected and handled accordingly. Interested parties are responsible for adequately marking proprietary or competition sensitive information contained in their response.
Responses to the notice will not be returned. Responders are solely responsible for all expenses associated with responding to this notice. ACC-RI will not pay for information received in response to this notice.
There is no commitment by the Government to issue an RFQ, make an award or awards, or to be responsible for any monies expended by industry responses to this notice.
Please respond with whether you are a small business or a large business.
Submit Responses by email to:
Angela Keller, CCRC-IGB, [email protected]
Responses are due by 1500P.M. Central Time 11 July 2014
Request for sources sought for two (2) cable and bollard barrier systems to include installation. One (1) 40' long, and one (1) 48' long. Foundation for the bollard shell shall go to frost depth of 42 quote mark below grade. The ratcheting bollard for each barrier shall be installed behind curbing of existing roadway, and in addition one side will be installed beyond current sidewalk. The government's preference is for the cables to both barriers connect to the same end support bollard. System shall be easily operable by one person within 3-4 minutes. Bollard posts and cables (when not in use) shall be covered by a lockable enclosure. Cables shall be reusable, all weather capable, and UV protected. The barrier system shall be crash tested to a minimum of ASTM PU40 standards. Installation shall be completed by 06 September 2014.
Angela Keller, 309-782-1221
ACC - Rock Island (ACC-RI)