The contractor shall furnish all labor, superintendence, machinery, equipment, tools, materials, services, and consumable supplies including transportation to and from the project site as required for a complete and operational Gate Operator that includes replacement of two existing rail-type gate operators with chain drive operators and installation of Two Entry Intercom System with keypad, two remote keypads and wireless remote access.