The work includes removal of the center portion of the existing 60" conduit, which consists of segmental vitrified conduit and concrete pipe, installation of new 60" Reinforced Concrete Pipe, re-grade the shoulder area, install Type 5 Guardrail and other related work. The estimated construction cost is $46,281.00.