Work consists of all labor, tools, materials and equipment necessary to replace the existing bridge carrying the
Avenue over the Brook with a new precast concrete arch bridge and wingwalls, and related work and materials.
Prime contractors must be prequalified with ConnDOT for Class 11 work under Group No. 3 Bridge Structures,
and have on file a sworn statement (Form CON-16).