The Contractor shall provide all materials, labor, equipment, transportation, insurance, permits, bonds and other services necessary to remove and properly dispose of the existing 215 ton, Trane RTAA air cooled chiller and furnish and install a new 225 ton Trane RTAC air cooled chiller or City approved equal at the City’s Wastewater Operations. The new chiller must be installed in the space occupied by existing unit and connected to the existing chill-water piping, electrical supply. The Building Automation System wiring and controls must also be reconnected.