Provide all materials, labor and equipment needed to furnish and install a replacement standby generator (55kW/68.75KVA) at the Littleville Lake Project. The installation also includes all work necessary to connect the generator to the existing, vertical exhaust piping, air venting ductwork, fuel supply piping, and electrical switchboard. Work also includes removal and proper disposal of the existing standby generator and related items.
Jennifer Samela, 978-318-8324
USACE District, New England