The work shall consist generally, of removing four (4) existing HVAC systems to include condenser unit, air handler, and all related parts, dispose of old units, recover existing refrigerant, obtaining all proper permits, charging all systems with new R-410A refrigerant, ensure systems are operating within the manufactures specifications, more particularly described in the Technical Specifications.