Non-mandatory (but strongly encouraged) pre-bid meeting 06/08/2010.
Note: link contains information for obtaining full RFP and specs, which must be requested directly from Agency.
Work consists of replacing the existing chiller at buildings B549, B558 and B562, installing generator at the lift station for the facility and installing an alarm system for the freezer/coolers at buildings B552 and B570. Included in the work is any concrete foundation, electrical and plumbing work as called for.