The Project consists of repaving, repair of the current transit vehicle storage lot and expansion of the vehicle storage lot. Improvements include new asphalt pavement structure, concrete pavement, pervious concrete pavement, storm sewer, a keystone retaining wall, landscaping, fencing, and an enhanced dry swale.