The Natural Resources Conservation Services intends to award a Firm Fixed Price (FFP) construction contract to repair the auxiliary spillways for the Bourbanis and Olson Dams in Pembina and Cavalier Counties, North Dakota.
DESCRIPTION OF WORK: The project includes clearing and grubbing; disposal of trees, snags, logs, brush and stumps; fence removal; excavation and off-site disposal of materials; transport of earthfill and topsoil, and seeding and mulching of two areas totaling approximately 5.25 acres.
The estimated magnitude of construction is between $500,000 and $1,000,000.
The North American Industrial Classification System Code (NAICS) applicable to this requirement is 237990, with a small business size standard of $33.5 million.
This procurement is being solicited as a 100% small business set-aside.
The period of performance will be 80 calendar days from issuance of Notice to Proceed (NTP).
A site visit will be held on 26 June 2014 at 9:30 local time. See Section C of the solicitation for further information. Those wishing to attend the site visit must provide their company name, and names of attending personnel to the contacting officer via email 48 hrs prior to the site visit.
NOTES: The solicitation documents can be accessed ONLY via FedBizOpps: www.fbo.gov. If you are a first-time FedBizOpps user, you will have to be registered before accessing the solicitation documents. IT IS THE SOLE RESPONSIBILITY OF INTERESTED CONTRACTORS TO VIEW THE WEBSITE FOR CHANGES.
In order to recieve a contract award, contractors must have an active registration in the System fo Award Management (SAM) website: https://www.sam.gov.
Jeffrey T. Adkins, Phone 8175093436, Email [email protected]