Repair Trench Line at Range #201 in the Grafenwoehr Training Area (GTA), USAG Bavaria Tower Barracks.
1. Repair the existing live fire trench line in a length of 230m by replacement of the entire old wooden covering and structure in already installed conrete shell.
2. Excavation work in the area of entries/exits and bunkers.
3. Remove and reinstall gravel basalt by manual excavation.
4. Dispose of the entire removed wooden structure and the gravel basalt layers in the bunkers.
Jason Klopf, +49 09641838476
RCO Grafenwoehr (PARC Europe, 409th CSB)