The construction work shall consist of the
following tasks:
A. Removal of soil that has slumped into bottom of roadside ditch, proper
disposal of said soil, and restoration of ditch bottom by reseeding.
B. Removal and disposal of plastic side slope drain pipe.
C. Stabilization of roadside ditch side slopes by placement of gabions herein
after referred to as reno mattresses.
D. Importation and placement of Type 3 rip rap.
Terrence D. Johnson, Phone 9122673090, Email Terrence.Johnson@fletc.dhs.gov - Shannon D. Anthony, Contracting Officer, Phone 9122613630, Email Shannon.Anthony@fletc.dhs.gov