Furnish all necessary labor, equipment and materials necessary to repair Unit 2, an Allis-Chalmers 231 inch diameter Francis Runner, which includes mob and demob at the site, excavation of cavitation damage on the turbine blade, weld repair of excavated areas, replacement of wicket gate packing on 28 wicket gates, collection of grease in the turbine pit and dispose of grease.
Kathleen M. Souders, 314-331-8502
USACE District St. Louis