Non-mandatory Pre-bid meeting 4/21/09
ESTIMATED COST: Between $360,000 to $390,000
SUMMARY OF SCOPE: Providing all labor, materials, and equipment necessary to repaint the exterior surfaces of all metal enclosures and the interior surfaces of masonry transformer oil containment basins at the (11) eleven BART Traction Power Substations and Gap Breakers Stations.