This document has expired, therefore the above link may no longer work.
Non-mandatory pre-bid conference 05/26/2010.
Work includes:
--repair concrete slab --renovate water tower base and curbing --remove steel plate --provide and install new water tower fixture and foot-operated inlet --cover and overlap asphalt aprons