The RFP Database
New business relationships start here

Remove and replace existing guardrail system with W-beam guardrail (approximately 1300 linear feet in Keene, NH and approximately 100 linear feet in Surry, NH).


Massachusetts, United States
Government : Military
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Remove and dispose of 1,300 feet of existing wood post and steel cable guardrail, and install 1,300 feet of new W-beam guardrail system along the north reservoir access road at Otter Brook Lake, Keene, New Hampshire and 100 feet of new W-beam guardrail system along north spillway access road at Surry Mountain Lake, Surry, New Hampshire.

Jennifer Samela, 978-318-8324

USACE District, New England

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP