The Project’s scope of work includes:
1. Mobilization
2. Clearing, grubbing and vegetation removal and disposal
3. Maintenance of Traffic (MOT) for all affected City and SHA roads and pedestrian paths and sidewalks
4. Sediment control, tree protection, stabilization and restoration
5. Removal, demolition and hauling off-site of the existing bridge and appurtenances, water line, and stairs and concrete sidewalk and securing of the site