Provide all labor, materials, and equipment to complete demolition of airport building, including removal of adjacent sidewalks and curb and gutter, sawcutting all asphalt pavements at the perimeter of the building demolition site, grading the site to drain after demolition, placing and compacting 12 inches of crushed aggregate base course on the entire building demolition site in preparation for asphalt paving, and necessary related work.