The work comprises, but is not limited to: Mobilization; traffic control; 6-ft tapered cold-planing; crack sealing; construction of a 3/8-inch Asphalt Rubber and Aggregate Membrane (ARAM) interlayer; construction of full width 0.12-ft Conventional AC overlay; R&R of ADA ramps; adjusting water/gas valves and manhole covers to grade; reinstallation of traffic signal detector loops; painting of traffic legends and striping including glass beads; and installation of raised pavement markers.