Demolish (remove and legally dispose of) existing three (3) 7.5 HP Refrigeration Units (Equipment including all refrigerant lines) and replace by supplying & installing two (2) new 15 HP Refrigeration Units (Equipment including all electrical wiring and required refrigerant lines).