The Super Corridor consists of a defined and organized logistical path for the transportation system for Materials Management and Pharmacy and Dietary Services, to support inpatient and clinical functions. The corridor will directly link the main loading dock with the Hospital Tower elevators. While portions of this pathway already exist, a final connection must be cut through space currently occupied by the central Pharmacy, located on the first floor. The remainder of the path must be widened from 8 feet to 12 feet in order to provide a sufficient width for the proposed use.