The reconstruction includes, but is not limited to, full depth pavement reconstruction; widening of bridge, installation of riprap for scour protection of the abutments, control and removal of invasive vegetation; construction of a 10 foot wide bikeway along the length of the project; replacement of an existing water main; new drainage system, curbing and landscaping.