For geotechnical-drilling operations. The drilling is in support of gathering design data. The drilling work requires a truck and a track- mounted drill rig(s) capable of drilling holes to at least 50ft using hollow stem auger (HAS) or 150 ft using casing and tri-cone drilling methods.