The work consists of constructing a new permanent roadway on both a new horizontal and vertical alignment, as well as constructing a temporary detour roadway. The curve realignment work will include roadway excavation, removal of existing pavement, placing new asphaltic concrete pavement, installation of new and extension of existing corrugated metal pipe culverts and related channel realignment, installation of guardrail and barbed wire fence, pavement marking and signing, landscaping, utility relocations, and other related work.