The work consists of raising the roadway profile, reconstructing two single span bridges, extending a box culvert, removing and reinstalling guard rail, milling the existing pavement and replacing it with Asphaltic Concrete End Product (Special Mix), improving drainage, reconstructing lighting systems, installing rock containment system, removing and reinstalling water line, placing pavement marking, and performing other related work.