This document has expired, therefore the above link may no longer work.
Mandatory pre-bid meeting 04/27/2010.
The Contractor shall furnish all labor, materials, tools and equipment to perform all the Work shown on the drawings and called for in the specifications, in order to replace the roof on the Agency building.