The work includes the application of an asphalt sealer, areas of full depth repairs, and pavement markings. The Trail includes spot full depth repairs, resurfacing, replacement of the safety rails, and pavement markings. A 10 foot wide multi-use path will be constructed. The total length of work is approximately 26.8 miles.