Mandatory pre-bid conference 02/18/2010.
THE WORK WITHIN THE PROJECT AREA CONSISTS OF (BUT IS NOT LIMITED TO) PAVEMENT RECLAMATION, PAVEMENT MILLING, PAVING, OVERLAY PAVING, REHABILITATION OF PAVEMENT BASE MATERIALS, CURB RESETTING AND REPLACEMENT, DRAINAGE IMPROVEMENTS, RESETTING AND REPLACING DRAINAGE CASTINGS, FRAMES, AND GRATES, ACCESSIBLE CURB RAMP IMPROVEMENTS, PAVEMENT MARKINGS, LANDSCAPING AND OTHER NECESSARY APPURTENANCES. THE TOTAL PROJECT LENGTH IS APPROXIMATELY 15,673 FEET (3.0 MILES).