Preproposal meeting June 5
Furnishing all labor, equipment, materials, designs, and services for project management and control; preliminary and final design and engineering; construction engineering; procurement of all equipment, materials and systems; construction of all facilities; design, manufacturing, installation, test, acceptance, safety and security certification of the system; and operation and maintenance of the completed OAC.