Pre-bid meeting 10/23/2009.
The Contractor shall provide all equipment, personnel and services necessary to conduct underwater visual inspection
including still photos and color video at Water storage facilities including all safety equipment and air monitors,
ladders, scaffolds, pumps, hoses, tools, locks (lock out, tag out) necessary to complete the work required. The facilities
include reservoir and storage tanks located throughout the greater metropolitan area. In addition to the inspection,
some facilities may require cleaning by the Contractor. Facilities will be isolated during inspection and cleaning. There is
one access hatch on each 20MG reservoir.