The Contractor will be required to furnish all labor, management, supervision, tools, materials, equipment, incidental engineering, and transportation necessary to replace two ash mixers for incinerator plant at Bldg. 1829, Commander Fleet Activities Yokosuka, Japan, but is not limited to the following work items referenced:
Replace 2 ash mixers including associated fittings listed below with new one.
Ash Mixer - 2 each
Water Tank Unit - 1 set
Control Panel - 1 each
Associated fittings for above materials - 1 lump sum (LS)
Level Indicator - 2 lump sum
Piping - 2 lump sum
Suction Chute for dust humidity controller - 2 lump sum
Discharge Chute for dust humidity controller - 2 lump sum