Mandatory pre-bid conference 06/30/2010.
Contractor shall perform the work necessary to repair the water control structures damaged by the hurricane. Work includes actuators, gear drives, pedestals, bearing plates, stem covers, gate stems, repairing lift gates, steel platforms and electrical.