The scope of work includes: Reconstruction of the perimeter service road between Taxiway Connector 8 and Taxiway Connector 5. Removal of the existing bituminous surface along with its processing and conversion for use as base course material, excavation, placment and compaction of the crushed aggregate base course, AC paving and placement of pavement markings and paint striping. This project also includes work to re-grade and replace the bituminous surface connecting Taxiway C12 to the service road and place a fog seal on the service road between the Taxiway Connector 8 and the CHP Taxiway Connector.