Contractor will remove 4 failing insulated cab windows at the RCS unit at North end of runway and replace with same-grade window. These windows are insulated double-pane safety glass, patterned and tinted to match all other windows in the RCS unit. See attachment 1 and 2. (See attached Statement of work for complete details.)
Contractor will schedule each area in advance with the Airfield Management Office.
Windows must be removed and installed when cabs are not occupied .
Background checks for each person will be required to work on the facility.
Hazmat forms must be filled out
For complete details see attached RFQ and SOW
GSA and Open Market will be considered
Please email complete bid package to [email protected]
After Solicitation Issue it is Your Responsibility to Check
the FBO site frequently for possible Addenda or other Items
that may affect the solicitation and the acceptance of your bid.
Lydia Johnson, Local Purchase Specialist, Phone 5802137583, Fax 5802135140, Email [email protected]