Amendment 1 revises Schedule of Items - page 3 of solicitation and page 2 of the drawings. Amendment must be submitted with quote.
West Branch Road Decommissioning
Scope of Contract. This project is one of the implementation projects of the Collaborative Forest Landscape Restoration Project (CFLRP). The goal of the CFLRP project is to utilize collaborative, science based ecosystem restoration techniques to improve watershed function while encouraging ecological, economic and social sustainability with an emphasis on providing local employment opportunities. This contract includes road decommissioning, access maintenance for roads and related work in compliance with its terms, specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals.
Description of Work. The West Branch Road Decommissioning project consists of decommissioning approximately 5 miles of road. Road decommissioning treatments range from drainage structure removal to complete recontouring. Roadways will be decompacted as described in worklists. All fill material in draws will be removed and stream channels restored to natural grade and dimensions. All disturbed areas will be seeded. In addition, native forbs and shrubs will be transplanted from areas adjacent to the road. Grade control structures will be constructed in stream channels. This project also includes 0.76 miles of road access maintenance. This will include temporary water crossings, brushing clearing and stabilizing the road upon final use.
Project Location. The project is located southeast of Kooskia, Idaho. From Kooskia travel south on Highway 13 for 11 miles to the junction of the Sally Ann Road. Turn left and travel 3.5 miles east to Clearwater, Idaho. Turn right on County Road 284 and travel south for 3.5 miles to the junction of Forest Road 1106. Turn left and head north east for approximately 6.5 miles to the beginning of the project area.
Pre-Bid Tour. No pre-bid tour.
Start Work. It is estimated that work will begin on August 6, 2014.. All work must be completed no later than October 31, 2014.
Deb Gerfen, Phone 208-983-4001, Fax 208-983-4098, Email [email protected] - Maple Stuivenga, Procurement Technician, Phone 2089834002, Email [email protected]