•A Pump Chamber adjacent to a lagoon cell and equipped with two (2) submersible pumps and the associated piping to collect and pump supernatant and centrate from the lagoons;
•A Valve Chamber downstream of the pump chamber and equipped with valves and piping;
•A 150 mm PVC forcemain to convey pumped flow from the valve chamber to the existing 200 mm gravity sewer on Kalar Road;
•300 mm collection pipes to collect centrate and supernatant from the various lagoon cells and convey to lagoon cell No.1 for flow to the pump chamber;
•A 100 mm PVC pipe from the maintenance building to the new pump chamber to pump stormwater if required;
•Associated civil, structural, electrical, mechanical, and I&C/SCADA work.