Mandatory pre-bid meeting 03/11/2010.
The work includes, but is not limited to the following:
Design, supply and install of the required instrumentation
Supply and install of all the building mechanical and electrical
All related piping and valves
All interior and exterior finishing
Excavation and backfill for proposed structure
Site grading, parking pad and landscaping once structure is completed
And other associated work