It is the Countys intent to enter into a comprehensive agreement with a single firm for
providing, installing, testing, integrating, and warranting a new ECC System at the new
Sheriffs Office, for the effective and economical operation of facilities utilized by KGC.
The selected firm (Contractor) shall furnish all labor, materials, tools, and resources
necessary to design, develop and install new ECC equipment and facilities in the new
Sheriffs Office located at the new County Government Center. In addition, the
Contractor shall relocate and make operational the existing ECC equipment located in the
current Sheriffs Office to Fire Station Company 1. In order to achieve this goal, the
Contractor must provide goods and services that include, but are not necessarily limited
to, those outlined below.