This project consists of, but is not limited to, the construction of a parking lot and extended driveway that includes approximately 1,540 square yards of 6 thick reinforced concrete pavement, approximately 230 square yards of 7 thick reinforced concrete pavement, 6 thick lime stabilized subgrade 6 thick reinforced concrete curbs, and the installation of approximately 360 cubic yards of fill