Project 603-18-201 Correct Out Building Exterior Deficiencies: Repair


Tennessee, United States
Government : Federal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Page 1 of 1
The Robley Rex VA Medical Center VA Medical Center has a requirement for a contractor experienced in healthcare construction to provide construction services for Project 603-18-201, Correct Out Building Exterior Deficiencies in accordance with the Statement of Work, Project Specifications and Drawings. The work includes general hospital construction, alterations, necessary removal of existing structures, construction, and certain other items as provided in the Statement of Work, Specifications and/or Drawings.
The project work will take place in a medical environment and the proposed contractor shall take into consideration infection control, demolition noise, environmental dust control, and specialized facility requirements as necessary in working in a medical/hospital centered setting.
NAICS Code 236220 is applicable to this requirement. The Small Business size standard is $36.5M.
The estimate range of construction is between $500,000.00 and $1,000,000.00
This requirement will be procured by way of FAR Part 14, as sealed bid. The solicitation will be available for bid 2-3 weeks after the posting of the pre- bid.
This requirement is a 100% percent set-aside for Service Disabled Veteran Owned Small Business (SDVOSB) concerns under the authority of 38 U.S.C B'8127 (d). Only those SDVOSB s listed and viewable in the Center for Verification & Evaluation (CVE) database located at https://www.vip.vetbiz.gov/. The CVE database will be checked at the time of offer submission as well as prior to award. All offers must also have an active listing in the System for Award Management (SAM) database. The awarded contractor must also submit evidence of enrollment with VETS4212.
In addition to the requirements as set forth in the solicitation notice (to be issued), the proposed contractor must also be determined responsible in accordance with FAR Part 9. The Contracting Officer will determine responsibility prior to award any award being made.
Questions related to this requirement will only be addressed in writing by way of email to the Contract Specialist at Daniel.Tibitoski@va.gov. The Project number, Project Name and Solicitation Number must be included in the subject line of all questions related to this requirement.
No questions will be considered until the actual solicitation is released, on or by July 3rd , 2018.

Daniel Tibitoski
Contract Specialist

Daniel.Tibitoski@va.gov